Free snapshot · Updated 22 October 2026
58 Parkway, Camden, London, NW1 7AH
Archived auction listing
This page records a past auction offering. The guide price, rent and particulars are historical. Current availability is not confirmed.
- Historical guide price
- £1,250,000
- Advertised rent at auction
- £110,600
- Gross rental yield
- 8.85%
The advertised annual rent of £110,600 represents a gross rental yield of 8.85% at the £1,250,000 historical guide price, before purchase and running costs.
The property
Shop let on a Licence to Individuals (t/a Bobby`s Barbers) from 2/04/2026 at £24,000 pa. The rear office benefits from a garden and the first floor 1 bedroom flat has access to an outside terrace. FLOOR AREAS Ground Floor Retail - 21.10 sq m (227 sq ft) Ground Floor Office - 36 sq m (387 sq ft) First Floor – 1 Bed Flat Second & Third Floor – 2 Bed Maisonette Please note the whole building, except the front elevation (which was re pointed and cleaned) was built/ reconstructed with new materials in 2017 at a cost of circa £500,000.
Rental income and occupation
TENURE Freehold TENANCY.
Rear Office let to Area Camden Limited (t/a Fostering.
Other considerations
Support) for a term of 9 years from 1st January 2022 at £24,000 pa on a Full Repairing & Insuring Lease.
Rent Review 2028 - Mutual 3 month break option.
Flat B – 1 Bed Flat – let on an assured shorthold tenancy (AST) at £2,300 pcm (£27,600 pa).
Flat C – 2 Bed Maisonette – let on an assured shorthold tenancy (AST) at £2,900 pcm (£34,800 pa) Total Gross Rent/ Licence Fees Reserved - £110,600 per annum exclusive VAT VAT is not applicable EPC RATINGS - C, C, C & C.
Allowing for a gap in rental income
Three months without any rental income would reduce annual receipts by £27,650, leaving £82,950 before costs. This illustrates a whole-property loss of rent; it is not a forecast or an assumption about any tenant’s lease.
Details not established in this archive
- No Energy Performance Certificate (EPC) details were captured. Ask for the certificate or exemption for each relevant unit before assessing any energy improvement costs.